RFP for Improvements to the Float Bridge Road causeway

Excavating Contractors Needed!
Improvements to the Float Bridge Road causeway
Improvements to the Float Bridge Road causeway

Town of Castleton

Invitation to bid for Improvements to the Float Bridge Road causeway

The Town of Castleton will be accepting bids to construct improvements to the eastern portion of the Float Bridge Road causeway where crossing Lake Bomoseen. The project includes the installation of 24” – 36” blast rock slopes adjacent to the gabion walls supporting the causeway. An Army Corps of Engineers, State of Vermont Lake Encroachment and State of Vermont Construction General permits apply to this project.  Electronic copies of bid documents, plans and technical specifications are available online at http://www.castletonvermont.org.  A pre-bid meeting, which is strongly recommended, will be held on site at the Float Bridge Road causeway at 10 a.m., on April 25, 2016.  Bids shall be submitted to Town of Castleton - Mark S. Shea, Town Manager - P.O. Box 727 – Castleton, VT  05735 on or before 3:30 p.m. on May 6, 2016. As an alternate method, bids may be submitted via email to manager@castletonvt.org.

See more in the Bids & RFPs page to include five (5) additional downloadable documents.